Woodhull Road over Woodhull Creek Bridge Rehabilitation
Woodhull Road over Woodhull Creek Bridge Rehabilitation
This $0.460 million project involves the rehabilitation of the Woodhull Road Bridge over Woodhull Creek (BIN 3310660) in Oneida County, NY and the reconstruction of approximately 190 feet of the bridge approach roadways. The existing bridge is a 108 foot two span continuous steel beam structure with a steel open grate deck. The project includes removal of the existing deck and replacement with a new concrete composite deck on the existing steel beams, installation of approach slabs and use of jointless bridge construction details.
Work tasks include design survey and mapping, development of a design report, preliminary and final bridge and roadway design, environmental documentation, public participation, advertisement and bidding services and construction support and inspection services.
It is a locally-managed federally-funded “Bridge NY” project, which mandated use of New York State Department of Transportation (NYSDOT) design procedures and criteria and an adherence to an 18 month consultant design schedule.














