Town of Owego Long Creek Road Three-Sided Culvert
Town of Owego Long Creek Road Three-Sided Culvert
Delta was selected by Binghamton Precast and Supply Corporation to provide design computations and the review of shop drawings for a 30’ x 8’ three-sided culvert for the replacement of Long Creek Road over Long Creek (BIN 2218750). Long Creek Road has experienced major flooding, affecting the surrounding homes. Replacing the undersized culvert was crucial to help with water flow and to mitigate flood events.
This project consisted of construction of a new three-sided precast concrete structure. The scope of work included cast in place concrete footings, wingwalls, headwalls, associated earthwork, road construction, and guide rails. Removal of an existing temporary bridge was also part of the project tasks.